Vous êtes ici

Egypt - Feasibility Study for Rehabilitation-construction of ZEFTA Barrage - Project Completion Reports (PCR) - 04 2015

02-avr-2015

The sector goal is to develop and manage the very limited water resources in Egypt in the most efficient manner that satisfies all the needs whilst maintaining the sustainability of the resources through the application of the principles of Integrated Water Resources Management (IWRM).

The specific study objective is to determine the most technically viable, economically feasible, and environmental and socially acceptable option for the rehabilitation/reconstruction of Zefta Barrage, including the production of a comprehensive feasibility report and the associated engineering designs, bills of quantities and tender documents for the selected option

Sections Connexes