Vous êtes ici

EOI – Multinational - Angololo water resources development project studies implementation - Technical advisory support on dam safety

22-juil-2019

The Republics of Uganda and Kenya, through the Nile Equatorial Lakes Subsidiary Action Program (NELSAP) of the Nile Basin Initiative (NBI), have received a grant from theNEPAD Infrastructure Project Preparation Facility Special Fund (NEPAD-IPPF Special Fund) managed by the African Development Bank to finance the preparation of Angololo Water Resources Development Project for Implementation.

Sections Connexes