EOI – Rwanda - Hiring consultant expert for electrical/electromechanically construction supervision - EDCL

16-avr-2019

The Rwanda -DRC Regional Transmission Interconnection project originated in 2013 under the ownership of the Energy, Water & Sanitation Authority (Rwanda) and Société National d’Électricité (Democratic Republic of Congo). The project comprised the 220kV Double Circuit Transmission Line and Substations.The Project covered new installations and the extension of 5 (five) 220 / 110 / 30kV substations (S/S) in the countries of Rwanda and DR Congo as well as their integration into the existing Load Dispatch Centre at Kigali and their integration into the Communication Network Management System.