Soudan du Sud – Projet d’amélioration stratégique de l’approvisionnement en eau et de l’assainissement (SWSSIP) - Rapport d’évaluation

21-juin-2019

The objective of the Strategic Water Supply and Sanitation Improvement Project (SWSSIP) is to improve the quality and delivery of urban water supply services in Juba City, in Jubek State, within the Equatoria region and rural water supply and sanitation services to rural communities in Jubek State. The project cost is estimated at UA19.621million,of which UA 8 million will be resources from Transition Support Facility (TSF) Pillar I window, UA 8 millionis from ADFPBA and UA 1.659 million(Euro 2 million)will be from the RWSSI Trust Fund,while UA 1.962millionwill be in kind contribution from the Government of South Sudan. The project will be implemented within a period of 48 months,from July 2019 until December 2023.

Le Projet d’amélioration stratégique de l’alimentation en eau et de l’assainissement (SWSSIP) vise à améliorer la qualité et la prestation des services d’approvisionnementen eau et d’assainissement dans la ville de Juba, dans l’État de Jubek, au sein de la région de l’Équatoria,et les services d’alimentation en eau et d’assainissement aux communautés rurales dans l’État de Jubek. Le coût du projet est estimé à 19,621 millions d’UC, dont 8 millions d’UC proviendront du guichet du Pilier Ide la Facilité d’appui à la transition, 8 millions d’UC de l’ABPdu FADet 1,659 million d’UC (2 millions d’euros) du Fonds fiduciaire IAEAR.LeGouvernement du Soudan du Sud apportera pour sa part une contribution de contrepartie en nature d’une valeur de 1,962 milliond’UC.Le projet sera mis en œuvre sur une période de 48 mois, de juillet 2019 à décembre 2023.

Sections Connexes