Vous êtes ici

Swaziland - Mbabane Bypass Road Project - Project Completion Report (PCR)

26-aoû-2019

To fill the missing link on the Matsapha-Mbabane-Ngwenya corridor and provide the vital link towards enhancing regional integration through development of the east/west corridor which forms part of Swaziland’s commitment to the SATCC protocol; to ease the traffic flow between the South African border and the interior part of Swaziland which is currently the most heavily trafficked road in the country; to contribute towards achieving the sector goal by providing an efficient and cost-effective transport system for both national and international traffic within Swaziland; and to enhance linkages between Swaziland and the neighbouring countries of Sout Africa and Mozambique.

Sections Connexes