Vous êtes ici

DRC - Batshamba-Tshikapa road improvement project– Loange Bridge-Lovua bridge section - Project Appraisal Report

24-jan-2020

The Batshamba-Tshipkapa Road Improvement Project: Loange Bridge-Lovua Bridge Section forms part of the rehabilitation of National Highway 1 (RN1)-BananaMatadi–Kinshasa-Lubumbashi-Kasumbalesa-Sakania (3,130 km). The road improvement works are organized into 2 lots: (i) Lot 1 ‘Batshamba- Loange Bridge’ (114 km), to be financed under EDF 10; and (ii) Lot 2 ‘Loange Bridge-Tshikapa’ (119 km). The Lot 2 improvement works are envisaged in two phases: (i) Phase 1 involving the improvement of the ‘Loange Bridge- Lovua Bridge’ section (63 km) and; (ii) Phase II involving the improvement of the ‘Lovua Bridge-Tshikapa’ section (56 km, including the construction of the bridge over the Kasai River). This project concerns Phase 1 of Lot 2. In time, implementation of Phase II will result in a fully paved road between Matadi and Tshikapa. The project will be implemented from June 2012 to May 2015, at a total estimated cost of UA 53.55 million (UAM) comprising UAM 42.65 in foreign exchange and UAM 10.90 in local currency

Sections Connexes