Lesotho

27-jan-2017

Lesotho-Likalaneng -Thaba Tseka Road Upgrading - Lot1 (Likalaneng -Cheche's Pass) - Project Completion Report (PCR)

The Poverty Reduction Strategy paper (PRSP) of the Government of Lesotho (GOL) recognizes that the development of rural roads makes an impact on economic growth and poverty reduction. It is in this context that GOL is committed to the implementation of Road Rehabilitation and Maintenance Program (RRMP) with the goal of improving the road transport operating efficiency, providing access to isolated rural areas and developing the institutional capacity of the sub-sector. The Likalaneng - Thaba Tseka road project has been conceived in this context and admitted into RRMP.
20-déc-2016

Lesotho - Projet de réhabilitation et d’extension du réseau de distribution d’électricité en milieu urbain - Rapport d’évaluation

Le Projet de réhabilitation et d’extension du réseau de distribution d’électricité en milieu urbain, comprenant la rénovation de stations de commutation et de lignes de transport, la construction de 8 km et 132 KV de lignes de transport et l’extension du poste de Khukhune, vise à améliorer la fiabilité et la qualité de l’offre d’électricité en faveur des clients actuels.Le réseau de distribution d’électricité rénové et renforcé permettra de réduire de 2% les pertes et de 25% les coupures de courant, avec à la clé une disponibilité du réseau en hausse de 5%. La réhabilitation des stations de...
29-nov-2016

The African Water Facility promotes sustainable growth through climate resilient water resources development in Southern Africa

The African Water Facility (AWF) approved a grant of about €2 million to support a multinational transboundary project to prepare a Climate Resilient Water Resources Investment Strategy and Multipurpose Project for the Orange-Senqu River Basin, serving the population of Botswana, Lesotho, Namibia and South Africa. The main goal of this project is to promote sustainable socio-economic growth in the basin riparian countries through climate resilient water resources development in the framework of basin wide cooperation led by the Orange Senqu River Basin Commission (ORASECOM). The project will...
28-nov-2016

ADF-14 : Interview with Tom Mbeta, Alternate Governor, Lesotho (ADF beneficiary country)

11-nov-2015

Southern Africa Quarterly Report 3rd Quarter -2014 - Issue No.14

02-nov-2015

Lesotho - Projet de réhabilitation du réseau urbain de distribution d’électricité – Résumé PGES – 11 2015

La demande d’électricité, en tant que source d'énergie dont l’utilisation facilite les progrès techniques et stimule l'économie en réalisant des gains de productivité, ne cesse d’augmenter au Lesotho. Cela se confirme par la hausse constante de la consommation d'électricité dans des secteurs qui sont considérés comme des moteurs économiques, à savoir, l'exploitation minière, la construction et le textile. Il est donc impératif que la Lesotho Electricity Corporation (LEC) assure un approvisionnement en électricité fiable et efficace. La fiabilité de l’approvisionnement en électricité mesure la...
15-jan-2015

Lesotho - Projet de route Khamane-Oxbow - REPP

Le présent rapport d’évaluation de performance de projet (REPP) concerne la performance du Projet de route Khamane-Oxbow au Lesotho. Le projet a bénéficié d’un prêt FAD N° CS/LES/TR/86/18 d’un montant de 6,424 millions d’UC approuvé le 18 juin 1986. Le prêt est entré en vigueur le 1er avril 1987 et le premier décaissement a été effectué le 26 juin 1987. Les travaux se sont achevés le 10 avril 1990 et le dernier décaissement a été effectué le 22 septembre 1994. Le prêt a été consacré au financement de la construction et du bitumage de la route du projet, y compris la supervision des travaux...
05-nov-2014

Southern Africa Quarterly Report 2nd Quarter-2014 Issue No.13

The Southern Africa region reported an acceleration of growth in over half of the countries in the second quarter of 2014. In five countries, growth either decelerated or stayed on course. Growth was strongest in Angola, which grew by 8.8 percent, driven by growth in non-oil activities in the construction and energy sectors; followed by Mozambique, which grew by 7.5 percent, supported by the acceleration of trade related activities, transport, telecoms, and manufacturing and electricity; and Zambia, which grew by 6.5 percent following strong public expenditure in social sectors and...
26-aoû-2014

Southern Africa Quarterly Review and Analysis – 1st Quarter 2014 - Issue 12

The Southern Africa region continued on a positive growth path with significant differences in growth rates among countries in the region. Mozambique, Zambia and Angola registered the fastest growth rates, exceeding the 7 percent growth rate target of the Southern African Development Community (SADC), supported by positive performance of the mining sectors and strong public expenditure. Officials in Zimbabwe also predict a significant acceleration of growth (from 3.7 percent in 2013 to 6.1 percent in 2014) premised on the successful implementation of its Agenda for Sustainable SocioEconomic...
22-aoû-2014

Working Paper 206 - Growth and Distributional Impact of Agriculture, Textiles and Mining Sectors in Lesotho

Accelerating economic growth and poverty reduction are and continue to be the critical policy challenges in Lesotho. The sluggish growth in agriculture, uncertainty surrounding textile and diamonds as drivers of Lesotho’s economic growth raise debates over the relevant direction and emphasis of development interventions in the country. Other concerns are in connection with the relevance of these sectors. This stems from their ability to attain high and inclusive growth which is the country’s development objective. Over the last two decades, the Lesotho economy has attained robust economic...
15-juin-2014

Lesotho: Projet de développement des services de santé

04-juin-2014

Public-Private Partnerships finance national hospitals in Lesotho

Many African governments are facing increasing demands for health financing despite having fewer resources available and receiving dwindling donor financing. This disconnect compels governments to come up with innovative financing mechanisms to achieve the Millennium Development Goals. In Lesotho, adequate government financing is not keeping up with the need for hospitals, which has led to the search for alternative financing to build a new hospital. A public-private partnership has been found to be the most suitable way to achieve this objective. The new hospital, a...
20-mai-2014

Le Lesotho souscrit à la Facilité africaine de soutien juridique

Le Royaume du Lesotho a souscrit à la Facilité africaine de soutien juridique (dite en anglais ALSF), lundi 19 mai à Kigali, devenant ainsi le 57e État à rejoindre l’ALSF. Ratifié en marge d’une réunion de haut niveau du Conseil de gouvernance de l’ALSF – placée sous la thématique : « Réduction des écarts de capacités dans les négociations de contrats : quatre ans de la Facilité africaine de soutien juridique » –, l’accord a été signé par le ministre des Finances du Lesotho, Leketekete Ketso et le directeur de l’ALSF, Stephen Karangizi. A cette occasion, Leketekete...
19-Feb-2014

Southern Africa Quarterly Review and Analysis – 4th Quarter 2013 - Issue 11

The Southern Africa region closed the year on an overall positive note, notwithstanding the downward revisions in growth projections seen in nearly half of the countries covered. Early indications show that the average growth rate for 2013 was 4.3 percent, only slightly lower than the 4.4 percent predicted in the third quarter. On a positive note, growth was strong in Mozambique, Zambia and Angola and picked up in Malawi and Swaziland. Mozambique continued on a strong growth path driven by growth in the mining sectors (coal) and in transport and communications.
15-jan-2014

Lesotho - Mpharane-Bela Bela Road Upgrading Project - PPER

15-jan-2014

Lesotho: Maseru Water Supply Project

15-jan-2014

Lesotho: Projet de parc d'engraissement du Betail

15-jan-2014

Lesotho: Projet de developpement rural integré de Phuthiatsana

15-jan-2014

Lesotho: Projet d`Entretien de routes

15-jan-2014

Lesotho - Projets d’adduction d’eau de Quatre centres et de Maseru II

Le présent rapport d’évaluation de performance (REPP) porte sur le Projet d’adduction d’eau de quatre centres et le Projet d’adduction d’eau de Maseru II, situés tous les deux au Royaume du Lesotho. Le coût total du premier projet était estimé à 13,23 millions d’UC, dont 6,08 millions devaient provenir du FAD, 2,93 millions du NORAD et 2,69 millions du Fonds de l’OPEP, la contribution du gouvernement s’élevant à 1,53 million d’UC. Pour ce qui est du second projet, son coût était estimé à 18,08 millions d’UC, sur lesquels le FAD et la BAD devaient apporter respectivement 7,37 et 6,63 millions...