The East Africa Quarterly Bulletin is produced by country economists and country program officers of the African Development Bank Group’s (AfDB) East Africa Regional Resource Center (EARC), Nairobi, Kenya. The publication covers thirteen countries including Burundi, Comoros, Djibouti, Eritrea, Ethiopia, Kenya, Rwanda, Seychelles, Somalia, South Sudan1 , Sudan, Tanzania, and Uganda. The Bulletin is part of the AfDB’s monitoring of socio-economic developments across the continent and provides summary information on the previous quarter’s major developments across the sub-region for which data...
18-avr-2019

African Legal Support Facility supports $200 million energy plant in Rwanda

The African Legal Support Facility has provided advisory services support to the Government of Rwanda for the negotiation of its deal with Symbion Power to develop a $200-million-dollar energy plant by Lake Kivu in Rwanda, signed on 29 March 2019. The energy plant is expected to generate an additional 56 MW of electricity for Rwanda, marking a significant step in Rwanda’s efforts to increase its installed power generation capacity by 291MW to 512MW by 2024. The plant will extract methane gas from the production area at Lake Kivu and use it to produce electricity. The Symbion Power...
16-avr-2019

EOI – Rwanda - Hiring Consultant expert for Civil Expert for Construction Supervision - EDCL

The Rwanda -DRC Regional Transmission Interconnection project originated in 2013 under the ownership of the Energy, Water & Sanitation Authority (Rwanda) and Société National d’Électricité (Democratic Republic of Congo). The project comprised the 220kV Double Circuit Transmission Line and Substations.The Project covered new installations and the extension of 5 (five) 220 / 110 / 30kV substations (S/S) in the countries of Rwanda and DR Congo as well as their integration into the existing Load Dispatch Centre at Kigali and their integration into the Communication Network Management System.
16-avr-2019

EOI – Rwanda - Hiring consultant expert for electrical/electromechanically construction supervision - EDCL

The Rwanda -DRC Regional Transmission Interconnection project originated in 2013 under the ownership of the Energy, Water & Sanitation Authority (Rwanda) and Société National d’Électricité (Democratic Republic of Congo). The project comprised the 220kV Double Circuit Transmission Line and Substations.The Project covered new installations and the extension of 5 (five) 220 / 110 / 30kV substations (S/S) in the countries of Rwanda and DR Congo as well as their integration into the existing Load Dispatch Centre at Kigali and their integration into the Communication Network Management System.
16-avr-2019

EOI – Rwanda - Hiring Consultant expert for PREPARATION OF PROJECT COMPLETION REPORTS (PCR) - EDCL

The African Developing Fund (ADF) provided resources to Multinational-Interconnection of Electrical Grids of Nile Equatorial Lakes Countries (Rwanda-DRC Grids Interconnection Project) for preparation of Project Completion Reports.The Bank is therefore seeking to procure an Energy Specialist/Power System Individual Consultant and/or a Development Specialist consultant, to assist the Bank Group and NELSAP. Consultant required in assessing through a Project Completion Report (PCR)of the completed project to identify what has been achieved, what lessons can be learned from the projects, and...
16-avr-2019

African Development Bank: Manufacturing key to boost economic growth and job creation in East Africa – Regional Economic Outlook Report

The manufacturing sector will hold the key to future growth in East Africa, the African Development Bank’s lead Economist for the Bank’s East Africa Regional Office has emphasised. Speaking during the launch ceremony of the report held 4 April in Nairobi, Kenya, Dr Marcellin Ndong-Ntah said the manufacturing sector’s potential to accelerate regional economic growth, generate more job creation, and ultimately reduce poverty was significant. “In order to achieve this objective, countries must continue to look for alternative sectors of economic growth, emphasise regional trade and...
11-avr-2019

Rwanda : Le 11 avril 2019, la Banque africaine de développement commémore « Kwibuka25 »

La Banque africaine de développement, en collaboration avec l'Ambassade du Rwanda en Côte d'Ivoire et la communauté rwandaise en Côte d'Ivoire, organise une cérémonie pour commémorer le 25e anniversaire du génocide des Tutsis au Rwanda. L'événement a lieu le 11 avril de 12 h à 13 h 30 GMT à l'Auditorium Babacar Ndiaye, au siège de la Banque africaine de développement. La commémoration a pour thème cette année « Remember-Unite-Renew » (« Se souvenir-s’unir-se renouveler » en français, ndlr). En 1994, durant trois mois...
11-avr-2019

#KWIBUKA25 : La Banque africaine de développement commémore la 25e commémoration du génocide contre les Tutsis au Rwanda

C’est avec des poèmes, des vidéos et un témoignage poignant d'un ancien procureur général du Tribunal pénal international des Nations unies pour le Rwanda (TPIR) que la Banque africaine de développement, en collaboration avec l'Ambassade du Rwanda et la communauté rwandaise en Côte d'Ivoire, a commémoré le 25eanniversaire du génocide contre les Tutsis au Rwanda, sur le thème « Se souvenir – S’unir – Se renouveler ». Étaient présents pour l’évènement, organisé le jeudi 11 Avril, le ministre des Ressources animales et halieutiques, Kobenan Kouassi Adjoumani, représentant le Premier...
04-avr-2019

Perspectives économiques régionales 2019 - Afrique de l'est

Ce rapport analyse la croissance économique, ses moteurs et ses conséquences sur le développement social – notamment la pauvreté, l’emploi et les inégalités – ainsi que l’état d’avancement de l’intégration régionale en Afrique de l’Est.
04-avr-2019

African Development Bank and Microsoft launch All-female Coding training in Nigeria

One hundred and sixty young women have begun a  month-long coding class on two Nigerian campuses under a new programme to give African youth digital skills for the work force. The Coding for Employment programme, organised by the African Development Bank  and  Microsoft Philanthropies, prioritises young women who typically have been side-lined in the technology ecosystem. At  a  launch event held 25 March at Covenant University under the theme: “Think Equal, Build Smart, Innovate for Change,  academics, women leaders in technology and tech start-up...
26-mar-2019

EOI – Rwanda - Technical Audit of the Rehabilitation and Widening of Kagitumba-Kayonza-Rusumo (208km) road Project

The Government of Rwanda has received funds from the African Development Bank, acting for the EU-Africa Infrastructure Trust Fund (EI-AITF) , toward the cost of “Technical Audit”, as a component of the Multinational: Uganda/Rwanda: Busega - Mpigi and Kagitumba - Kayonza - Rusumo Roads Project ( 208km )and intends to apply part of the agreed amount for the grant to payments under the contract for Technical Audit of the Rehabilitation and Widening of Kagitumba - Kayonza - Rusumo ( 208km) road Project.
19-mar-2019

EOI – Rwanda - Study for Transport and Trade Facilitation on North-South Corridor on Gisiza-Rubavu Road Project - RTDA

The Rwanda Transport Development Agency (RTDA) has received financing from the African Development Bank toward the cost of the project to develop roads (Mugina-Mabanda-Nyanza Lake and Rubavu-Gisiza) and Facilitate transport on the North-South Corridor Phase III, and intends to apply part of the agreed amount of the loan and the grant to payments under contract for Study for Transport and Trade Facilitation on North-South Corridor on Gisiza-Rubavu Road Project.
27-Feb-2019

Les gouverneurs d’Afrique de l’Est saluent les projets « hautement transformateurs » de la Banque africaine de développement

Les gouverneurs de la Banque africaine de développement pour l’Afrique de l’Est ont salué, mercredi à Abidjan, les projets « hautement transformateurs » financés, depuis 2010, par l’institution, pour un montant total de 13,8 milliards de dollars. Les gouverneurs et représentants du Burundi, de Djibouti, du Rwanda, des Comores, du Soudan, du Soudan du Sud, d’Éthiopie, de Tanzanie et d’Ouganda s’exprimaient dans le cadre des consultations annuelles avec le président de la Banque,...
26-Feb-2019

IFB – Rwanda - Acquisition of Books for Biomedical engineering, E-health & Rehabilitation and Mobility sciences laboratories

This Invitation for Bids follows the General Procurement Notice (GPN) for this project that appeared in UNDB online and on the African Development Bank Group’s Internet Website.   The Government of Rwanda has received funds from the African Development Bank (AfDB) towards the cost of Regional Centre of Excellence in Biomedical Engineering and eHealth (CEBE) Project.  It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for Acquisition of Books for Biomedical engineering, E-health & Rehabilitation and Mobility sciences...
19-Feb-2019

IFB – Rwanda - Construction Works of Centre of Excellence in Biomedical Engineering and e-Health (CEBE)

This Invitation for Bids follows the General Procurement Notice (GPN) for this project that appeared in UNDB online and on the African Development Bank Group’s Internet Website.  The Government of Rwanda has received Funds from the African Development Bank (AfDB) towards the cost of East Africa’s Centers of Excellence for Skills and Tertiary Education in Biomedical Sciences Project - Phase 1. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for Construction Works of Centre of Excellence in Biomedical Engineering and e-Health (...
07-Feb-2019

GPN – Rwanda - Rwanda Sustainable Water Supply and Sanitation Program - Additional financing

The Government of the Republic of Rwanda has received a loan from the African Development Bank (“the Bank”) and a grant from the Rural Water Supply and Sanitation Initiative (RWSSI) Trust Fund administrated by the Bank to finance the “Rwanda Sustainable Water Supply and Sanitation Program - Additional financing”. The project is jointly financed by the Bank and the Government of Rwanda. The Water and Sanitation Corporation, WASAC Ltd is the Implementing Agency. WASAC Ltd therefore intends to apply the proceeds of these funds for payments of all works and services to be procured under this...
07-Feb-2019

PPM – Rwanda - Sustainable Water And Sanitation Program

PPM – Rwanda - Sustainable Water And Sanitation Program (55 kB)
31-jan-2019

Multinational - Projet d’interconnexion des réseaux électriques du Burundi et du Rwanda dans le cadre du NELSAP - Rapport d’évaluation

L’interconnexion des réseaux électriques du Burundi et du Rwanda, qui fait partie du projet multinational d’interconnexion des réseaux électriques des pays des lacs équatoriaux du Nil (PMIREL-PLEN ou NELSAP en anglais) approuvé le 27 novembre 2008 par la Banque, consiste à construire 140,7 km de ligne 220 kV initialement exploitée en 110 kV (79,2 km au Burundi et 61,5 km au Rwanda), 2 postes 220/30 kV et à faire l’extension de 2 postes 110 kV, entre les villes de de Gitega et Ngozi au Burundi, et les villes de Butaré et Kigoma au Rwanda. Le Projet contribuera à l'amélioration des conditions...
29-jan-2019

EOI – Rwanda - Consultant Services for Capacity Building Needs Assessment - Capacity Building for WASAC Ltd and Different Structures Involved in Water and Sanitation Management

The Government of the Republic of Rwanda has received financing from the African Development Bank in the form of loan towards the cost of Rwanda Sustainable Water Supply and Sanitation Program. The Water and Sanitation Corporation (“WASAC Ltd”), an Executing Agency, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for the Consultant Services for Capacity Building Needs Assessment; and Capacity Building for WASAC Ltd and Different Structures Involved in Water and Sanitation Management.
28-jan-2019

Contract awards – Rwanda - Consultancy Services for the Supervision of Works for the Construction of Kigali Centralized Sewerage System (KCSS) - WASAC