P-SD-FAC-003

Project Details
ID: P-SD-FAC-003 Name: POWER PROJECT Status: Closed Country: Sudan
Sector: Power Approval date: 05-mai-1974 Task Manager: LEKOETJE Daniel Tsenolo, OINF3
Total cost: 4000000
Currency: UAC
Source(s) of financing
AfDB: 4000000
Implementing Agency: PUBLIC CORPORATION ROADS AND BRIDGES

Objectives

A major risk in the implementation of the loan is the possible reluctance of the Banking system to engage in term financing for SMEs, perceived generally to be more risky than traditional commercial financing. This could lead to slow disbursements. This risk has, however, been minimized by allowing the Participating Banks a reasonable spread in on-lending to beneficiaries.

Description

A major risk in the implementation of the loan is the possible reluctance of the Banking system to engage in term financing for SMEs, perceived generally to be more risky than traditional commercial financing. This could lead to slow disbursements. This risk has, however, been minimized by allowing the Participating Banks a reasonable spread in on-lending to beneficiaries.

Benefits

A major risk in the implementation of the loan is the possible reluctance of the Banking system to engage in term financing for SMEs, perceived generally to be more risky than traditional commercial financing. This could lead to slow disbursements. This risk has, however, been minimized by allowing the Participating Banks a reasonable spread in on-lending to beneficiaries.

Rational

A major risk in the implementation of the loan is the possible reluctance of the Banking system to engage in term financing for SMEs, perceived generally to be more risky than traditional commercial financing. This could lead to slow disbursements. This risk has, however, been minimized by allowing the Participating Banks a reasonable spread in on-lending to beneficiaries.