ACHWA II HYDROPOWER PLANT


Aperçu

  • Référence: P-UG-FAB-007
  • Date d’approbation: 14/12/2016
  • Date de début: 14/12/2017
  • Date d'évaluation: 03/10/2016
  • Statut: ApprouvéAPVD
  • Agence d'implémentation: --
  • Emplacement: Uganda

Description

Design, construction and operation of a 42 MW (4x10.5 MW turbines) turnkey run-of-river hydropower plant (HPP) with an annual output of 281 GWh along the Achwa river, in Gulu district, Northern Uganda, including a 38km access road. Client intends to implement in total five plants (109MW) in the region, Achwa 2 being the first one. This greenfield plant shall be interconnected to the grid by a 140km transmission line (t-line) to the substation at Lira to be constructed by the Uganda Electricity and Transmission Company Limited ("UETCL").


Contacts clés

EL GAZZAR Ahmed Mohamed - PERN1


Coûts

Source Montant
BADUSD 14.330.754
DeltaUSD 64.477.646
TotalUSD 78.808.400