THABAMETSI COAL POWER PLANT


Aperçu

  • Référence: P-ZA-FB0-001
  • Date d'évaluation: 25/09/2017
  • Présentation au conseil: 13/12/2017
  • Statut: PipelinePIPE
  • Agence d'implémentation: --
  • Emplacement:

Description

Design, Construct, Own, Operate and Maintain a 630 MW coal fired power plant on a BOO basis. The project will consists of 4 boiler unites of 157.5 MW and 2 turbine unites of 315MW each in the two blocks based on environmentally efficient coal technology. The project is located in the Waterberg Area, in the Province of Limpopo in South Africa (RSA) and it shall be interconnected by a 25 Km double circuit 400kV line which is to be constructed by Eskom. The project (630MW) is currently proposed under Coal Baseload IPP procurement Program (CBIPPP) by the DoE and most probably it will be selected as a preferred bidder since only one participant is involved in the tender. Accordingly, the purpose of this PEN is to provide the Bank


Contacts clés

LI Jing - PESR2


Coûts estimatifs

Montant
 2.147.483.647