Name: PANDAMATENGA AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT
Status: Ongoing
Country: Botswana
Sector: Agriculture
Approval date: 09-Set-2008
Task Manager: SOLIMAN Wael Mohamed Roshdy, RDGS4
Total cost: 42268160.76 Currency: UAC
Source(s) of financing AfDB: 36696013.7 Government: 5571411.11
Implementing Agency: MINISTRY OF AGRICULTURE
Location: PANDAMATENGA AREA
Objectives
The specific objective is to increase cereal production of the 25,000 ha arable farms from the current level of 0.5 to 2.5 metric tonnes per ha for the traditional farmers; and 2 to 3.5 metric tonnes per ha for the large scale farmers
Description
The project will facilitate water control and access road development for rain fed agricultural production within 27,574 ha of farm land in Pandamatenga area. The project will incorporate water management and ecosystem conservation concepts in crop production, train beneficiaries and provide equipment for effective production activities. The project would run for four years and will comprise three components as follows: 1)Infrastructure Development;2)Agricultural Production Improvement; and 3) Project Coordination. COMPONENT I: INFRASTRUCTURE DEVELOPMENT a. Drainage System Subcomponent The drainage system will be upgraded for 25,074 ha and a new network will be constructed in 2,500 ha. The drainage system will consist of a system of field bunds which discharge water into drainage channels and culverts. Two types of earthen perimeter bunds will be constructed. A total of 100 km of type-A constant level perimeter bund will be provided alongside the fields. On the remaining part of the lower boundaries of each field a type-B perimeter bund will be constructed. The total length of this bund will be 210 km. The control of the outflow for the harvested runoff is by means of 600 mm diameter piped outlets through the lowest point along the perimeter bund or by lined channels within the bunds. The total length of channels will be 340 km with about 337 km lined. Bottom widths vary from 0.5 to over 6.0 m and depths from 0.3 to 1.8 m. About 70 pipe culverts of various sizes will also be provided for access onto the fields and at drain-road junctions including replacement of the nine, 1200 mm diameter culvert across the main highway. b. Road Network Subcomponent The tracks within 25,074 ha are not motorable when saturated during the rainy season. These tracks will be redeveloped into a gravel road network and new gravel roads constructed in 2,500 ha area to provide all-weather access to each field and facilitate maintenance of the electric perimeter fence. The network will be 190 km in length and 8.0 m wide (6.0 m carriageway with 2.0 m shoulders). The road cross-section will be cambered to a slope of 3.5% from the centre-line to the sides and side ditches provided for good drainage of the road surface. The cross-section will be constructed of a treated sub-grade, overlain by a 150 mm gravel sub-base and a 150 mm gravel wearing surface. The treated sub-grade will range from loosening and re-compaction of 150 mm of existing ground for the best existing ground conditions, to replacement of a 300 mm depth of existing soil with non-expansive but plastic material where the expansive soils with worst properties occur. c. Farm Buildings and Related Infrastructure The project will also construct a farm shed/workshop for housing and maintaining farm equipment, as well as an input store/office, totalling 200m2 of floor space. In addition, four water boreholes will be provided at vantage points within the farm, to provide water for farm operations and domestic needs of farmers while on the farm, since these farms are far from residential areas. The construction of items under this subcomponent will be completed during the PY 2. COMPONENT II: AGRICULTURAL PRODUCTION IMPROVEMENT a. Soil Fertility Management Initiatives Subcomponent The project will support initiatives aimed at general soil fertility management. Research activities will be intensified to evaluate the effects of new technologies, assess new methodologies and make recommendations on the most advantageous methods to be employed by farmers. Capacity building for farmers will involve short training courses in relevant disciplines, including integrated pests and disease control. Study tours, field visits and Farmer Field Days will be organised to enable farmers share experiences. b. Ecosystem Management Subcomponent The project will erect solar powered electric fences totalling 24 km to reduce the interface between humans and wildlife, but necessarily to block migration routes. The new and old fences will also be maintained regularly. The project will relocate wildlife in cropped areas and implement appropriate environmental mitigation plans as spelt out in Section 4.7 and the EIA. c. Capacity Building Subcomponent Support will be provided to the Department of Agricultural Research in Pandamatenga to evaluate effects of new technologies, assess new methodologies and make recommendations on the effective methods.Research will be carried out on the rationalisation of fertiliser application practices, through the evaluation of alternative nutrient sources such as bio-fertilisers using plant residues, which may prove to be less expensive. Research will focus on: (a) introduction of adaptable crops and cultivars to facilitate suitable rotation systems; (b) improvement of agronomic practices for greater crop yields; and (c) monitoring of water quality in drainage system. The project will purchase farm machinery (4 tractors, 2 tine cultivators, 1 trailed boom sprayer, 2 heavy duty disc harrows, 2 pneumatic planters, 1 forage harvester, 1 combine harvester and 2 trailers) to support efforts of traditional farmers and transform their rudimentary land preparation technologies to levels of economic viability through mechanization. The equipment will be supplied with three-year stock of routine spares and will be operated by the farmers# association on rental basis. The practice of renting farm machinery by farmers is common in the area and has been proven successful. The proceeds will be paid into a special farm equipment operation and maintenance account, from which the salaries of operators trained by the equipment agents and maintenance of equipment by certified agents will be paid. Incremental benefits arising from project support will be an incentive to expand production and this will enhance the capacity of farmers to pay for rented farm equipment. d. Apiculture Development Subcomponent Development of bee keeping for honey production as a complementary income generating activity will be supported as an outcome of a related Capacity Building Program through which farmers are being trained in business entrepreneurships. Farmers will be formed into groups and sensitized on the need for improved hives; demonstration of improved honey and wax production; external study tours will be organized for beekeepers; and honey processing equipment will be procured to support the farmer groups. Cost of this subcomponent is expected to start on the second year and would cost 0.08 million UA over the remaining life of the project. COMPONENT III: PROJECT COORDINATION A Project Coordination Team (PCT) will be established in Gaborone and will comprise 10 specialists from MoA; Ministry of Finance and Development Planning (MFDP); Department of Environmental Affairs (DEA);Wildlife and National Parks Department; Roads Department of the Ministry of Works and Transport (MWT), and District Agricultural Office in Pandamatenga. The capacity of the PCT to function effectively will be enhanced by the provision of three field vehicles (one at Gaborone and two at Pandamatenga), office furniture, computers, computer software, photocopiers, printers and Internet systems.
Benefits
The project has potential to produce up to 4 tons of sorghum per hectare. This translates to about 100,000 tons of sorghum per annum when the whole 250,000 ha is fully utilised. In terms of income, this translates to about US$24 million per annum, with current price of sorghum estimated at about US$240/ton. The benefit of the project in terms of enhancing food security both at national and household level, reducing hunger and poverty alleviation are quite apparent. The main benefits anticipated from the project include: 1. An improvement in water management resulting from drainage structures 2. Improved access into the farms, thereby enhancing production through easy movement of inputs into and around the farms as well as being able to transport the harvest from the farms to the market 3. An improvement in soil condition leading to improved crop production and yield 4. Improved food security, resulting from increased yield 5. Poverty alleviation resulting from increased income generation 6. Increase in agro-industries processing crop yields 7. Increase in employment through more labour force needed for production and processing activites The main beneficiaries of the project would be: 1. commercial farmers whose production and income would be significantly improved following the infrastructure development 2. small subsistence farmers in the vicinity of the commercial farms that could benefit from the increased demand for labor, improved market for inputs and output
Rational
The project addresses the priorities of Botswana, as established in Vision 2016 and the National Development Plan 9 (2003-2009). The project is in line with the CAADP priority areas of land and water resources management and infrastructure development. The provision of a water drainage system and road network would facilitate access into the farms and alleviate the water logging problem in the farms, which has resulted in annual losses estimated at about US$340,000. It is anticipated that the construction of the infrastructure would minimize losses caused by floods and thus undoubtedly increase the returns. An increase in the returns would have a positive implication on the productivity of the farms. The project is in compliance with Bank Group's assistance strategy for Botswana during the period 2004-2008 in its long-term objective of supporting Government's diversification agenda aimed at poverty reduction and employment creation. The Pandamatenga Arable Farms Infrastructure Development Project is fully consistent with the implementation of the Bank's Vision and its policies; Integrated Water Resources Management Policy; Agriculture and Rural Development Policy, Strategic Plan, Poverty Reduction Policy, and Environment Policy, which in totally strive to provide quality pro-poor sustainable development assistance to its RMCs to achieve sustainable economic growth, promote agricultural productivity, and implement poverty reduction strategies;and sound environmental management.