Name: Malawi - Nacala road corridor development project Phase V
Status: Ongoing
Country: Multinational
Sector: Transport
Approval date: 19-يونيو-2019
Task Manager: MAKASA Davies Bwalya, RDGS1
Total cost: 46702857.14 Currency: UAC
Source(s) of financing ADF: 26600000 Cofinanced: 15388571.43 Government: 4714285.71
Implementing Agency: --
Location: MALAWI / ZAMBIA/ MOZAMBIQUE
Objectives
The project development objectives are two-fold: (i) at regional level, the objective shall contribute to improving road transportation and trade facilitation along the Nacala Transport Corridor; and (ii) at national level, the project shall contribute to reduction of transportation costs along the Lilongwe-Blantyre and Liwonde-Mangochi road corridors respectively which in turn is expected to support stimulation of local economic activities in agriculture, agro-forestry, fisheries and tourism.
Description
The proposed project is Phase V of the on-going Multinational Nacala Road Corridor Development Project in Zambia, Malawi, and Mozambique. This project will therefore complement the economic benefits of the on-going projects along the Nacala Road Corridor. The target area is the entire Nacala Road Corridor from Lusaka in Zambia through Malawi and Mozambique to the Nacala Port. The project falls within the overall vision of SADC and has been endorsed by SADC member states at the highest level of summit. It is in line with the regional integration and development program of SADC, which is guided by the SADC Regional Infrastructure Development Master Plan and the revised Regional Indicative Strategic Development Plan (2015–2020). The project involves rehabilitation of Nsipe-Liwonde Road and construction of an OSBP between Malawi and Mozambique at Chiponde/Mandimba border post. The total cost estimate is UA 45.289 million. The project shall be implemented over a period of 5 years starting in July 2019 and ending in June 2024.
Benefits
The proposed project will contribute to improved movement of goods and services along the Nacala Transport Corridor. The project beneficiaries include an estimated population of over 4 million people along the Nacala Transport Corridor. At national level, the Nsipe-Liwonde-Mangochi road traverses the Balaka and Mangochi districts whose population is about 1.3 million people. The proposed 55km road rehabilitation project between Nsipe and Liwonde and the on-going 75 km road rehabilitation project between Liwonde and Mangochi will contribute are expected to generate an estimated 700,00 temporary jobs and 200 permanent jobs. It is anticipated that 70% of the jobs will be taken up by the youth and 25% by women. In addition to this, roadside markets will be constructed at suitable locations along the road to provide business opportunities for women and youth.