تقرير التقدم المحرز في التنفيذ والنتائج

Mission date:  From: 17.05.2019 To: 17.05.2019 The two Outcome indicators are off-track but with the expected acceleration of the...
Mission date:  From 25/11/2019 To 29/11/2019 The development goal is to develop a domestic aquaculture subsector which serves as viable and...
Mission date:  From 15/04/2019 To 18/04/2019 The project has made tremendous progress since it was signed. The full attainment of the DO will...
Mission date:  From 20/08/2018 To 25/08/2018 The project has completed and delivered the core outputs. The timely completion of...
Mission date:  From: 11 November 2019 To: 15 November 2019 The Project objectives are to contribute to economic growth and poverty reduction...
Mission date:  From 03.02.2020 To 10.02.2020 The overall implementation is currently slow; however, over 15 construction and rehabilitation...