P-UG-D00-005 Uganda – Airport Infrastructure Development Programme – Phase I

Le système de transport de l’Ouganda demeure fortement tributaire des infrastructures routières, qui assurent l’essentiel du transport de fret et...

Project details

P-UG-D00-005 Approved

Uganda – Airport Infrastructure Development Programme – Phase I

Country
Uganda
Sector
Transport
Approval
10-juin-2026

Source(s) of financing

    Objectives

    The programme development objective is to improve domestic and regional connectivity through investment in safe, efficient and cost-effective aviation infrastructure, thereby contributing to the development of tourism, trade and other productive sectors.

    More specifically, the programme aims to upgrade Arua Airport with climate-resilient and internationally compliant aviation infrastructure; improve the safety, reliability and efficiency of passenger and cargo services; strengthen institutional capacity in the aviation sector; support sustainable urban and spatial development around the airport; and position Arua as a regional aviation, logistics, trade and humanitarian hub serving Uganda, South Sudan and the Democratic Republic of the Congo.

    Description

    The Uganda Airports Development Programme – Phase I is a sovereign aviation infrastructure programme designed to improve domestic and regional connectivity through the modernization of Arua Airport in northwestern Uganda. The programme will upgrade the existing aerodrome into an international-standard, climate-resilient airport capable of supporting passenger, cargo, trade, tourism and humanitarian operations.

    The main investments include the construction of a 3,500-metre asphalt runway, taxiways and aprons; a passenger terminal and a cargo terminal with an annual capacity of approximately 25,000 tonnes; a control tower equipped with navigation and information technology systems; a fire station, car park, access road, security road and perimeter fencing. The infrastructure will incorporate green-building and climate-resilience measures, including solar energy, natural ventilation, energy-efficient lighting, rainwater harvesting, improved drainage, water-efficiency and waste-management systems, and electric ground-transport equipment.

    The programme will also support the preparation of an Aerotropolis Master Plan and detailed physical development plans for Arua’s growth centres, institutional strengthening in the aviation sector, technical assistance, environmental and social management, youth skills development, and feasibility and infrastructure studies for other Ugandan aerodromes, including Tororo, Nyamiringa, Pakuba and Kisoro.

    The total programme cost is estimated at EUR 157.76 million, financed by an African Development Bank loan of EUR 141.15 million, an African Development Fund loan of EUR 14.84 million, and an in-kind contribution from the Government of Uganda of EUR 1.77 million. No external co-financier is included in the financing plan for Phase I, although the European Union, World Bank, Islamic Development Bank and East African Development Bank have expressed interest in supporting subsequent phases. The executing agency is the Ministry of Works and Transport, while the Uganda Civil Aviation Authority is the implementing agency.

    Benefits

    The programme will be implemented at Arua Airport in Arua City, approximately 450 km from Kampala, in Uganda’s West Nile Region. Arua is strategically located near the borders with the Democratic Republic of the Congo at Vurra and South Sudan at Oraba, making the airport important for cross-border trade, passenger mobility, humanitarian operations and regional integration.

    The programme will directly benefit approximately 544,398 residents of Arua City and Arua District and indirectly benefit about 3.4 million people across the West Nile Region, which comprises 12 districts and one city. Beneficiaries include passengers, traders, farmers, agro-processors, tourism operators, logistics companies, airlines, exporters, importers, SMEs, humanitarian organizations and communities located around the airport.

    The upgraded airport will improve access to markets for high-value and perishable agricultural products, strengthen tourism and trade links, facilitate time-sensitive cargo and humanitarian assistance, and support increased economic activity in agriculture, agro-processing, logistics, hospitality, transport and light manufacturing. It will also benefit approximately 65,000 refugees hosted in Arua and the organizations providing humanitarian assistance to displaced populations in the border region.

    The programme is expected to create around 500 temporary jobs during construction, approximately 100 permanent direct jobs, and an estimated 1,427 indirect jobs across tourism, agriculture, logistics and local trade value chains. At least 40% of direct employment opportunities will be reserved for young people, while women are expected to receive 30% of temporary employment opportunities and 50% of permanent jobs. At least 100 young people, including 30% women, will receive training in engineering, construction, mechanics, plant and equipment operation and other market-relevant vocational skills.