Submeter um documento / Pedido de informações

×

Mensagem de erro

  • Notice: Undefined offset: 4 em i18nviews_handler_field_taxonomy_term_description->pre_render() (linha 46 de /apps/www.afdb.org/sites/all/modules/i18nviews/includes/i18nviews_handler_field_taxonomy_term_description.inc).
  • Notice: Trying to get property of non-object em i18nviews_handler_field_taxonomy_term_description->pre_render() (linha 46 de /apps/www.afdb.org/sites/all/modules/i18nviews/includes/i18nviews_handler_field_taxonomy_term_description.inc).

Relatório de progresso na implementação e resultados

Mission date:  Ethiopia from: 09.12.2019 To: 13.12.2019 Kenya from: 02.12.2019 To: 06.12.2019 Bothe the outcome and output are satisfactory...
Mission date:  From: 17.05.2019 To: 17.05.2019 The two Outcome indicators are off-track but with the expected acceleration of the...
Mission date:  From 25/11/2019 To 29/11/2019 The development goal is to develop a domestic aquaculture subsector which serves as viable and...
Mission date:  From 15/04/2019 To 18/04/2019 The project has made tremendous progress since it was signed. The full attainment of the DO will...
Mission date:  From 20/08/2018 To 25/08/2018 The project has completed and delivered the core outputs. The timely completion of...
Mission date:  From: 11 November 2019 To: 15 November 2019 The Project objectives are to contribute to economic growth and poverty reduction...
Mission date:  From 03.02.2020 To 10.02.2020 The overall implementation is currently slow; however, over 15 construction and rehabilitation...