Relatório de progresso na implementação e resultados
Mission date:
Ethiopia from: 09.12.2019 To: 13.12.2019
Kenya from: 02.12.2019 To: 06.12.2019
Bothe the outcome and output are satisfactory...
Mission date: From: 17.05.2019 To: 17.05.2019
The two Outcome indicators are off-track but with the expected acceleration of the...
Mission date: From 25/11/2019 To 29/11/2019
The development goal is to develop a domestic aquaculture subsector which serves as viable and...
Mission date: From 15/04/2019 To 18/04/2019
The project has made tremendous progress since it was signed. The full attainment of the DO will...
Mission date: From 20/08/2018 To 25/08/2018
The project has completed and delivered the core outputs. The timely completion of...
23-Jun-2020
Zambia - Agriculture Productivity and Market Enhancement Project (APMEP) - IPR Décembre 2019
Mission date: From: 11 November 2019 To: 15 November 2019
The Project objectives are to contribute to economic growth and poverty reduction...
Mission date: From 03.02.2020 To 10.02.2020
The overall implementation is currently slow; however, over 15 construction and rehabilitation...
- « first
- ‹ previous
- …
- 762
- 763
- 764
- 765