P-Z1-DB0-160 Guinea - Coyah-Farmoreah-Sierra Leone Border Road Reconstruction Project

Réalisation des Services d’Audit Comptable et Financier des exercices 2025, 2026 et 2027 du Projet de reconstruction de la route Coyah Farmoreah...
Elaboration et la Mise en œuvre d’un Plan de Communication et de Visibilité du Projet de Reconstruction de la Route Coyah-Farmoreah-Frontière...
La République de Guinée a reçu des financements de la Banque Africaine de Développement (BAD) ci-après dénommée la Banque et de l’Union Européenne...
PPM - Guinée - Projet de reconstruction de la route Coyah-Farmoréah- Frontière Sierra Léone (Simplifié) - COYAH  
Le Gouvernement de la République de Guinée a reçu des financements du Groupe de la Banque Africaine de Développement (BAD) et de l’Union...
Le Gouvernement de la République de Guinée a reçu des financements du Groupe de la Banque Africaine de Développement afin de couvrir les coûts des...
PPM - Guinée - Programme d'Aménagement de route et de facilitation des transports au sein de l'union dufleve mano/ Projet d'aménagement et de...
Les services prévus au titre de ce contrat comprennent : Définir une procédure commune, comprise et acceptée par les deux administrations...
Le Gouvernement de la République de Guinée a reçu un financement du Groupe de la Banque Africaine de Développement (BAD) et de l’Union Européenne...

Project details

P-Z1-DB0-160 Ongoing

Guinea - Coyah-Farmoreah-Sierra Leone Border Road Reconstruction Project

Country
Multinational
Location
COYAH-FOREKARIAH-FARMOREAH-PAMELAP
Sector
Transport
Task manager
DIOP Maimounatou NdiayeRDGW3
Implementing agency
DIRECTION NATIONALE DES INFRASTRUCTURES (DNI)
Appraisal
01-Ago-2017
Board presentation
25-Out-2017
Approval
25-Out-2017
Implementation
29-Jun-2019
Total cost87380780 UAC

Source(s) of financing

  • ADF38280000
  • Cofinanced48740780
  • Government360000

Objectives

The sectoral objective of the project is to contribute to strengthening integration and subregional trade, through the growth of trade between Guinea and Sierra Leone and the strengthening of cooperation and integration in Africa. The specific objective is to contribute to the improvement of: (i) the level of service on the Conakry-Freetown axis; (ii) conditions for crossing and crossing the border between Guinea and Sierra Leone; and (ii) accessibility to basic services and living conditions of the populations in the Project's Direct Influence Zone.

Description

The project for the reconstruction of the Coyah-Farmoreah Sierra-Leone border road was designed to provide a response to the crucial needs to open up the production areas concerned by the project and contribute to improving the competitiveness and diversification of their economies by linking Conakry to Freetown on a fully tarred road. This should unlock the region's strong agricultural and industrial potential, stimulate trade, reduce poverty and social inequalities, and consolidate peace and security at the level of Guinea and Sierra Leone. The present project will consist of: (i) rebuilding the 75 km of the road by widening it to the standard ECOWAS standards (7m of pavement and two shoulders of 1.5m each) with a structure covered with asphalt concrete (BB) as well as the structures on this road; (ii) make operational the checkpoints juxtaposed to Pamelap by supporting the interconnection of customs computer systems of both countries as well as the implementation of the joint control of goods on import and export; (iii) provide support to the transport sector by improving road safety, axle load control, and conducting project preparatory studies and (iv) strengthen the capacity of the Executing Agency and Customs Administration in Guinea. The project will be implemented over a period of 4 years for a total cost HT / HD, including physical contingencies and financial uncertainties, estimated at 62.24 million UA, the equivalent of 78.08 million EUR. It comprises five components, namely: (A) Road reconstruction; (B) development and related measures; (C) transport facilitation; (D) support to the transport sector; and (E) project management.

Benefits

The direct beneficiaries of the project are transport users, producers in the project area and local residents.