×

Error message

  • Notice: Undefined offset: 2 in i18nviews_handler_field_taxonomy_term_description->pre_render() (line 46 of /apps/www.afdb.org/sites/all/modules/i18nviews/includes/i18nviews_handler_field_taxonomy_term_description.inc).
  • Notice: Trying to get property of non-object in i18nviews_handler_field_taxonomy_term_description->pre_render() (line 46 of /apps/www.afdb.org/sites/all/modules/i18nviews/includes/i18nviews_handler_field_taxonomy_term_description.inc).

P-CD-E00-002 Democratic Republic of Congo - Project for the Reinforcement of Socio-Economic Infrastructure in the Central Region (PRISE)

 Le Gouvernement de la République Démocratique du Congo a reçu un financement du Fonds Africain de Développement afin de couvrir le coût de...

Project details

P-CD-E00-002 Completed

Democratic Republic of Congo - Project for the Reinforcement of Socio-Economic Infrastructure in the Central Region (PRISE)

Country
Democratic Republic of Congo
Location
RDC
Sector
Water Supply & Sanitation
Task manager
ZALI ZALI BrunoRDGC2
Implementing agency
GOUVERNEMENT DE REPUBLIQUE DEMOCRATIQUE DU CONGO MINISTERE DES FINANCES BUDGET
Appraisal
22-Jul-2013
Board presentation
27-Nov-2013
Approval
27-Nov-2013
Implementation
22-Jul-2014
Total cost116880000 UAC

Source(s) of financing

  • ADF45000000
  • Cofinanced55000000
  • RWSSI5086035.2

Description

The Project for the Reinforcement of Socio-economic Infrastructure in the Central Region (PRISE) covers the two Kasaï provinces which have a population of 8.2 million, that is, 12% of the country’s population. The PRISE comprises a rural component and an urban component. The rural component, based on the National Rural Drinking Water Supply and Sanitation Programme prepared with ADF financing, is a component of the 2013-2017 Five-Year Plan of the National Healthy Villages and Schools Programme (PVEA). This programme, which was launched by the Government in 2006 and coordinated by the Ministry in Charge of Health and Education, is supported by many donors. The urban component concerns: (i) the construction of the drinking water supply system of the Mbuji-Mayi town, the region’s main urban centre, in coordination with BADEA and KFW, and (ii) electrical power supply to help operate the drinking water system of Tshikapa town being constructed under the Semi-Urban Drinking Water Supply and Sanitation Project (PEASU). The estimated cost excluding tax of the project is estimated at UA 105.18 million, of which 82.17 million in foreign currency (78.12%) and 23.01 million in local currency (21.88%). The project is structured around the following components: A) infrastructure development (DWSS, schools, health centers, gender center); B) Studies and Capacity Building; and C) project coordination and management.