The fiduciary responsibility in its charter requires the African Development Bank to ensure that the proceeds in the projects and programs financed by it are used only for the purposes for which they were granted. The charter also requires that proper attention be paid to economy and efficiency in the procurement processes in Bank funded projects. Accordingly, the Bank prefers the most open competitive procedures for procurement of goods, works and services. Political and other non-economic influences or considerations must not influence procurement in Bank financed projects. The procurement procedures should give fair and equal opportunity to contractors, suppliers and consultants from member countries of the Bank. Transparency is also essential in the procurement process.

The Bank has developed Rules and Procedures for Procurement of Goods and Works and Rules and Procedures for Recruitment of Consultants that govern Bank financed procurement. To assist borrowers, the Bank has, in collaboration with other Multilateral Development Banks, also developed Standard Bidding Documents that should be used for contracts financed by the Bank.

As a part of its development mandate, the Bank is equally active in supporting the development and reform of public procurement systems in borrower countries. As the expenditure through public contracts is a sizeable portion of Government expenditure, increased efficiency, fairness, transparency and equal opportunity are critical for sustainable development and poverty reduction. 

05-Sep-2019 Contract Awards - Kenya - Consultancy Services for Design Review and Construction Supervision of “Design and Build” Construction of “Machakos Water Supply and Sanitation project Phase 1” in Tanathi Water Services Board Area
05-Sep-2019 Contract Awards - Kenya - Consultancy Services for Design Review and Supervision of Construction of Kitui-Matuu Water Supply and Sanitation Project in Tanathi WSB Area - Kenya Towns Sustainable Water Supply and Sanitation Program
05-Sep-2019 Contract Awards - Kenya - Construction Works for Narok Town Sewerage Project - Kenya Towns Sustainable Water Supply and Sanitation Program
05-Sep-2019 Contract Awards - Kenya - Consultancy Services For Feasibility Studies, Preliminary Designs, Detailed Technical Designs, EIA/RAP and Preparation Of Tender Documents For Oloolotikosh Dam, Kitengela-Kajiado in Tanathi Water Services Board
05-Sep-2019 Contract Awards - Kenya - Consultancy Services for Design Review and Supervision of Mwala Cluster Water and Sanitation Project in Tanathi WSB Area - Kenya Towns Sustainable Water Supply and Sanitation Program
04-Sep-2019 Contract Awards - Togo - Fourniture, installation et mise en service d’équipements informatiques pour la mise en place du Datacenter de l’OTR (Office Togolais des Recettes) Lot 1 - Projet d’Appui à la Gouvernance Fiscale (PAGFI)
04-Sep-2019 AMI - Multinational - Réalisation de l’étude de faisabilité du second projet du Programme régional de renforcement de la résilience à l’insécurité alimentaire et nutritionnelle au Sahel
04-Sep-2019 Contract Awards - Togo - Fourniture, installation et mise en service d’équipements informatiques pour la mise en place du Datacenter de l’OTR (Office Togolais des Recettes) Lot 2 - Projet d’Appui à la Gouvernance Fiscale (PAGFI)
03-Sep-2019 AMI - Guinée - Recrutement d’un cabinet charge de mettre en place l’equipe de l’UGP (Unité de Gestion de Projets)
02-Sep-2019 GPN - Tchad - Projet d’études pour l’aménagement de 135 000 ha de périmètres irrigués
02-Sep-2019 EOI – Sénégal - Production durable d'huile et de carburant à partir de paille de riz et de typha - Étude de faisabilité : Analyse technique du bilan de la matière première - Paille de riz et typha
02-Sep-2019 PPM - African Alliance For E-commerce (AACE) - Projet Africa Trade Fund : Grant To Support Africa E-Trade Hub
02-Sep-2019 EOI – Senegal - Sustainable oil and fuel production from rice straw and typha - Feasibility study : Feasibility Studies & Tax and License study
02-Sep-2019 AMI - Burundi - Recrutement d’un Cabinet d’Audit Chargé d’auditer les Comptes du Projet - Projet d’Appui à la Transformation Agricole dans la Région Naturelle de Bugesera (PATAREB)
02-Sep-2019 EOI – Sénégal - Production durable d'huile et de carburant à partir de paille de riz et de typha - Étude de faisabilité : Études de faisabilité & Étude des taxes et licences
02-Sep-2019 Prequalification - Nigeria - Engineering design, procurement, manufacture, supply, construction & commissioning of 330/132/33kv & 132/33kv substations - Nigeria Transmission Expansion Project (NTEP 1)
02-Sep-2019 Prequalification - Nigeria - Engineering design, procurement, manufacture, supply, construction & commissioning of 330kv double circuit quad conductor transmission lines - Nigeria Transmission Expansion Project (NTEP 1)
02-Sep-2019 EOI – Senegal - Sustainable oil and fuel production from rice straw and typha - Feasibility study : Technical analysis of the balance Sheet of Raw material – Rice Straw and typha
30-Aug-2019 AMI - Gabon - Études relatives à la construction d’un pont sur la rivière Oubangui et à l’aménagement des chaînons manquants dans les corridors routiers Bangui-Kisangani-Kampala & Kisangani-Bujumbura
29-Aug-2019 EOI - Mozambique - Review, Update and Completion of Mozambique’s Power Grid Codes