Project Details
ID: P-ET-EA0-004 Name: ADDIS ABABA W.S. STAGE III-A STUDY Status: Completed Country: Ethiopia
Sector: Water Sup/Sanit Approval date: 02-Oct-1992 Task Manager: JALLOW Sering Baboucarr, OWAS2
Total cost: 6890000
Currency: UAC
Source(s) of financing
ADF: 6078943
Government: 811057
Implementing Agency: ADDIS ABABA WATER AND SEWERAGE AUTHORITY

Objectives

The primary objective of the study is to prepare final detailed designs and tender documents for the Addis Ababa Water Supply Stage 3A Project.

Description

The study will cover the following : a) A more detailed hydrological study of the Gerbi and Sibilu catchments including reservoir sedimentation studies. b) Detailed assessment of the groundwater potential and the supervision of the drilling of 25 large diameter observation / production boreholes. c) A more precise study of the geotechnical conditions of the proposed dam sites and the proposed tunnel through Entoto Mountain range. d) Preparation of the detailed designs of the following : - The Gerbi and/or Sibilu dams with their associated structures. - The groundwater scheme for the four wellfields including treatment works, borehole installations, mains and storage and service reservoirs. - The transmission mains to the terminal reservoirs. - The first phase of the treatment plant for Gerbi and/or Sibilu which shall have a capacity of 5 x 50,000 cubic metres per day. - Extensions to the distribution and transfer system up to 100 km of pipelines of varying diameters, six service reservoirs, and six pumping stations. - Raw water pumping stations from Gerbi and/or Sibilu.

Benefits

The primary objective of the study is to prepare final detailed designs and tender documents for the Addis Ababa Water Supply Stage 3A Project.

Rational

The primary objective of the study is to prepare final detailed designs and tender documents for the Addis Ababa Water Supply Stage 3A Project.

P-ET-EA0-004