You are here

Benin - Second Rural Electrification Project - Project Completion Report (PCR)

13-Jun-2014

The criteria retained for project economic analysis are the economic rate of return (ERR) and the net present value (NPV). The methodology used is that of comparing the economic benefits coming from project implementation and operation with the economic costs (investments and operation) incurred.

Related Sections