Zimbabwe - Emergency Power Infrastructure Rehabilitation Project Phase II (EPIRPII) Stage II for the ZimFund project – ESMP summary (Updated)
27-Mar-2017
The total project scope was defined and approved at the onset, but executing was phased based on the availability of donor funding. Hence it was split into two stages, with Stage I covering components whose funding was available in 2014 and is currently under implementation and Stage II is for components that have been covered by additional resources received from donors in November 2016.