Source(s) of financing AfDB: 40027752.58 Cofinanced: 74362669.23
Implementing Agency: KRIBI POWER DEVELOPMENT COMPANY S.A
Location: CAMEROON
Description
The Project consists of the construction and operation of a 216 MW gas-fired power plant located in Mpolongwe, a village situated 9 km north of the coastal city of Kribi, in the southern province of Cameroon with a 100 km 225 kV transmission line to be connected to the Southern Interconnected Grid (SIG) of the Country. The Project will be developed on a BOOT basis.