ID: P-TZ-FA0-009 Name: IRINGA -SHINYANGA TX PROJECT Status: Ongoing Country: Tanzania
Sector: Power Approval date: 26-Oct-2010 Task Manager: MUGUWA Andrew, RDGE1
Total cost: 373200000
Currency: UAC
Source(s) of financing
ACFA: 42720000
ADF: 45360000
Cofinanced: 209830000
Government: 12570000
Implementing Agency: TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) Location: Shinyanga, Dodoma, Singida and Shinyanga

Objectives

"Provide adequate transmission infrastructure to link existing and future generation sources located in the South and Southwest of Tanzania to the load centers in the Mwanza and Arusha regions in the North."Facilitate regional power trade in the future especially with Kenya to the North and Zambia to the South

Description

The project consists of construction of a 667 km 400 kV AC transmission line split into three individual construction lots, namely (a) Iringa - Dodoma 225 km 400 kV AC Line, (b) Dodoma - Singida 217 km 400 kV A.C line, and (c) Singida - Shinyanga 225 km 400 kV AC line. The project also includes a component for expanding the substations at Iringa, Dodoma, Singida and Shinyanga.

Benefits

"Reinforcement of national power system back-bone "Increased availability of reliable power to the economy and electricity users in the country."Regional economic cooperation and development.

Rational

Tanzania is endowed with hydro power sites in the south and south west of the country. In addition the discovery of gas in the south of the country has incaresed its capacity to develop gas powered power plants which must be located near the gas fileds in the south. However, the power demand is mainly in city of Dar Es Saalam and other cities mainly located in the North of the country. It is therefore imperative that a strong transissmission link be establshist btween power generation sites and main load centers.

P-TZ-FA0-009

The development objective of the project was to construct in parallel to the existing 220 kV transmission line, new 400 kV Iringa - Shinyanga...