P-UG-DB0-036 UGANDA - Busega-Mpigi and Kagitumba-Kayonza-Rusumo Roads Project - Additional Financing
Project details
UGANDA - Busega-Mpigi and Kagitumba-Kayonza-Rusumo Roads Project - Additional Financing
- Country
- Uganda
- Sector
- Transport
- Approval
- 05-Nov-2025
Source(s) of financing
Objectives
The project development objective is to improve connectivity between Kampala and Kigali by eliminating the traffic bottleneck between Busega and Mpigi towns, thereby advancing regional integration through enhanced freight and passenger flows along the Northern Corridor. The project corridor is characterized by chronic congestion, resulting in day-long bottlenecks for transit and commuter traffic along the Northern Corridor. Travel conditions have deteriorated significantly; a journey that previously took less than 45 minutes now requires more than 2 hours over a 27.3 km road section. In addition, Uganda’s road maintenance backlog continues to grow due to insufficient budget allocations, placing the project road at risk of premature deterioration. The lack of local accessibility also slows urbanization in the peri-urban townships of Busega and Mpigi, hindering productivity within the Greater Kampala Metropolitan Area (GKMA). Within a theory of change framework, these constraints are expected to be addressed through additional financing focused on the following specific interventions: (i) construction of a 27.3 km dual carriageway, including 5 traffic interchanges, 4 link roads, 4.6 km of service roads, and a 3.6 km extension of the main roadway to enhance connectivity and safety; (ii) provision of 4 toll plaza platforms to facilitate the collection of road-user charges and strengthen financing for road maintenance; and (iii) construction of additional drainage structures to climate-proof the roadway against flooding during the operational phase.
Description
The original Rwanda/Uganda: Busega-Mpigi and Kagitumba-Kayonza-Rusumo Roads Project was a multinational operation covering Uganda and Rwanda. The Bank approved, on 22 June 2016, a combined financing for the two countries of UA 267.25 million. The Uganda road section cost was UA 136.13 million financed by ADB Loan of USD 91 million, ADF Loan of UA 42.5 million and government counterpart of EUR 37.79 million, while the Rwanda project section cost was UA 131.1 million, financed by African Development Fund Loan (ADF), Japan International Cooperation Agency (JICA) loans, and European Union (EU) grant.
Benefits
The project is expected to create up to 800 direct construction-related jobs and an additional 400 indirect jobs during the operational phase as new and/or attracted businesses emerge. Youth (who represent 22% of the national population aged 18–30) are expected to take up at least 264 of these positions, while women—representing 51% of the population—will account for up to 610 beneficiaries.