P-KE-DA0-001 Kenya - Jomo Kenyatta International Airport (JKIA) Airfield Expansion Project - 2nd Runway Development

The development of the 2 nd Runway is informed by the JKIA Master Plan of 2010, and is in keeping with the development objectives and priorities of...

Project details

P-KE-DA0-001 Cancelled

Kenya - Jomo Kenyatta International Airport (JKIA) Airfield Expansion Project - 2nd Runway Development

Country
Kenya
Sector
Transport
Approval
28-Nov-2017

Source(s) of financing

    Objectives

    . The development objective of the proposed project is to enhance regional integration and expand international trade via improved regional and international air connectivity. The specific project objectives are two-fold: i.) To improve reliability of air transport to and from JKIA by reducing aircraft delays at peak hours and costly flight diversions arising from incidences on existing runway, and abiding constraining configuration of the existing single runway facility that undermines its usability and overall operational efficiency of the airport; and ii.) To expand airfield capacity for the new generation (long-haul) aircrafts that would be attracted to JKIA after the airport attained in 2017, category I stat

    Description

    The development of the 2 nd Runway is informed by the JKIA Master Plan of 2010, and is in keeping with the development objectives and priorities of the Government of Kenya under Vision 2030 and the Bank’s Hi-5s Strategy supporting projects aimed at enhancing economic efficiency, regional integration, and facilitating international trade. The project entails: (i) construction of a parallel, 2.35km apart, 4.9 km long runway and connecting Taxiways, equipped to CAT II capabilities; (ii) Firefighting unit and trucks; and (iii) construction of a berm planted with trees to reduce noise impact. Consulting services include: construction supervision, Monitoring & Evaluation, and Update of JKIA Master Plan and Formulation of national airport development strategy. Institutional Capacity Building shall involve: Airport Pavement Maintenance Planning Study and Training of KAA & KCAA staff; whereas Supply of Equipment will include: Modern ATC equipment, Ambulifts, Navigational Aids, and Meteorological systems. The project is estimated to cost USD 189.6 million, and is co-financed by the Bank Group (84.4%) and the GoK (15.6%). The construction period is 30 months.