You are here
Multinational - Desert to Power Technical Assistance Program Phase II
DtP Phase II comprises support for project preparation and the creation of enabling frameworks, including for mini- grids, as well as capacity-building. The USD 5.03 million second phase of the DtP TA (DtP II) builds on a SEFA- funded technical assistance program (TA) of USD 5.05 million that was approved in December 2020 (DtP TA Program Phase 1), which has supported studies on the integration of variable renewable energy generation into interconnected and fragmented grids and completed at the end of 2024 in the Burkina Faso, Chad, Mali and Mauritania. The studies identified priority projects, including the construction of solar power plants and battery energy storage systems (BESS). Additionally, this complements a grant of UA 7.2 million for the “Desert to Power Technical Assistance Project for the Sahel” under ADF-16’s Regional Public Goods’ window, which was approved in December 2023 to support project preparation, private sector promotion, and enabling frameworks for green mini-grids across the nine (9) ADF countries of the initiative.