You are here

Somalia - Road Infrastructure Programme - Appraisal Report

23-Jul-2019

The Road Infrastructure Programme aims to improve management of the road sector at the national level and improve transport connectivity for road users in the targeted road corridors for rehabilitation while reinforcing the capacities of federal and regional institutions that manage road infrastructure. The programme entails: (i) rehabilitation and surface dressing of 82km (BeledWeyne-Kalabeyr 22km; and Dhusamareb-Qaradhi 60km) of the existing 327km, 7.3m wide BeledWeyne-Galkayo paved road; (ii) rehabilitation and surface dressing of 85 km (Galkayo-Faratoyo) of the existing 240km, 7.3m wide Galkayo-Garowe paved road; (iii) rehabilitation and construction of the existing 80km, 7.3m wide Luuq, Ganane-Dolow earth road to gravel road standard; and (iv) new construction of 100 km, 7.3m wide Galkayo-Elgula (part of 241km Galkayo-Hobyo feeder road) to compacted gravel standard and Feasibility study, environmental and social impact assessment and detailed engineering design of 280km Lowyaddo-Farddaha-Borama road.

Related Sections